Brand

weberfloor slope adjust

Durable
Electric mixer or by hand
Pouring

Key Facts

  • Substrate humidity before the application of weberfloor slope adjust must be lower than 6%.

Marketing description

For efficient bonding, it is recommended to prime the area with weberfloor 4716 before the application of weberfloor slope adjust by mixing weberfloor 4716 with water at the ration 1:3.
Use appropriate brush to push the primer into the substrate to cover all pinholes. Leave to dry for 60 minutes or touch dry.

Documentation

Select all
TDS_weberfloor_slope_adjust_ENG-1
weberfloor_slope_adjust-safety_datasheet